Our professional in house engineering team has the capability to manage pre construction design, in-field construction, and maintenance, including public works such as roads, bridges, canals, dams, airports, sewerage systems, pipelines, structural components of buildings, and railways.
We have embraced the age-old technique and science of determining the terrestrial or 3D position of points, distances, and angles between them by utilising the latest technology to complement our Trimble Earthworks earthmoving fleet in the field to BIM management of UG services. Our latest technology tools are Trimble Earthworks, Pix4D, UAV drone technology, Vision link, Procore, and mobile KML file UG services locating.
Our skilled team of professionals seamlessly integrates the latest technology with proven
engineering methods; effectively innovating the Engineering and Infrastructure Industry to bring
outstanding accuracy and efficiency to every stage of the process.
From planning and design to surveying and earthwork projects... technology provides the edge that allows us to deliver best value on each project.
Our scope of work included process pipe trench excavation and floor preparation, drainage, ducting and earthworks.
Added Value & Innovation
Successfully coordinating our work with other trades within a tight timeframe to high quality and safety standards
Programme 50 weeks
Budget met €3.2m
HSEQ Zero incidents and non-conformances
Deep basement excavation in high water table zone. Multi threshold contaminants that had to be tested prior to site removal.
Added Value & Innovation
Coordination of trucks in and out concrete and steel delivery management and working around two CFA piling rigs on a very tight site.
Programme 14 weeks
Budget met €855,000
HSEQ Zero incidents and non-conformances
1.2km of 700mm DI IW water main, Service diversions, Ducting.
Added Value & Innovation
We crossed through the live site under and over approximately 700 live services powering the facility without incident.
Programme 40 weeks
Budget met €3.4m + ongoing
HSEQ Zero incidents and non-conformances
Large Peat extraction from future blasting zone and deposition in peat storage areas 8km down the mountain. On the largest granite quarry in Europe the complex weather patterns and interaction with other large mining trucks sharing the same haul roads required detailed project planning and communication to ensure a safe operation throughout the project.
Added Value & Innovation
Overcoming offshore logistics for heavy plant and equipment.
Programme 12 weeks completed on time
Budget met €3.2m
HSEQ Zero incidents and non-conformances
Various DC sites with varied site issues.
Added Value & Innovation
Learning as we go. Learning that the clients needs are our core values.
A data centre owner minds the information of the world. We mind the infrastructure that protects that
Programme Various
Budget met €12,000,000
HSEQ Zero incidents and non-conformances
Site development for 100 plus residential units. Our scope of work involved all heavy earthworks, cut to fill, rock breaking, deep drainage, stormwater, foul water, communication and data ducting and water main placement. We also provided all set out to the Main contractor and drone surveys on a weekly basis for client documentation and progress reports.
Added Value & Innovation
Learning as we go. Learning that the clients needs are our core values.
A data centre owner minds the information of the world. We mind the infrastructure that protects that
Programme 104 weeks completed on time
Budget met €2.75m
HSEQ Zero incidents and non-conformances